skip to main
|
skip to sidebar
U-552
Dials, edge of CT,and top of aerial housing.
Dials
The ribs located at the front bulkhead, made out of the plastic coated wires from the sandwich bags. The rim going around the CT is 1mm copper wire sanded to the letter D profile.
Top surface of the aerial housing.
Newer Post
Older Post
Home
U 552 step by step
click the red arrows to view posts
►
2015
(1)
►
January
(1)
►
2009
(16)
►
April
(1)
►
March
(1)
►
February
(2)
►
January
(12)
▼
2008
(83)
►
December
(7)
►
November
(3)
►
August
(5)
►
July
(7)
▼
June
(7)
Aerial loop.
Line tensioner.
Dials, edge of CT,and top of aerial housing.
Console
UZO
Observation scope housing.
Latch
►
May
(12)
►
April
(9)
►
March
(10)
►
February
(10)
►
January
(13)